La Haule slipway - Le Mielle, St. Aubin: Seafront pathway alterations

A formal published “Ministerial Decision” is required as a record of the decision of a Minister (or an Assistant Minister where they have delegated authority) as they exercise their responsibilities and powers.

Ministers are elected by the States Assembly and have legal responsibilities and powers as “corporation sole” under the States of Jersey Law 2005 by virtue of their office and in their areas of responsibility, including entering into agreements, and under any legislation conferring on them powers.

An accurate record of “Ministerial Decisions” is vital to effective governance, including:

  • demonstrating that good governance, and clear lines of accountability and authority, are in place around decisions-making – including the reasons and basis on which a decision is made, and the action required to implement a decision

  • providing a record of decisions and actions that will be available for examination by States Members, and Panels and Committees of the States Assembly; the public, organisations, and the media; and as a historical record and point of reference for the conduct of public affairs

Ministers are individually accountable to the States Assembly, including for the actions of the departments and agencies which discharge their responsibilities.

The Freedom of Information Law (Jersey) Law 2011 is used as a guide when determining what information is be published. While there is a presumption toward publication to support of transparency and accountability, detailed information may not be published if, for example, it would constitute a breach of data protection, or disclosure would prejudice commercial interest.

A decision made 24 July 2025:

Decision Reference:  MD-INF-2025-537

Public

Subject: La Haule – Pathway Alterations

 

Report Title: La Haule – Pathway Alterations

Public

Decision(s):

The Minister for Infrastructure decided to implement, on a progressive basis, measures along the sea front between La Haule slipway and Le Mielle, St. Aubin, as set out in the report.

Reason for Decision(s):

The Minister was not aware of the last planning application to install a physical edge protection (railings). Having visited the site, the Minister believes alternative mitigation should be used. The proposed measures, as set out in the report, seek to balance identified safety concerns and the technical advice with community and political views, and are proposed as a practical and pragmatic compromise.

Resource Implications: These measures can be introduced through the utilisation of existing resources within the Department, and do not require additional monies.

 

Action Required: The Department and/or Ministerial Office to update relevant parties of the decision.

Signature:

 

 

Signed By: Minister for Infrastructure

Date Signed:

 

 

Date of Decision (If different from Date Signed):

 

 